Goliath Boiler (Btu range from 180K to 6.8M) is a modern commercial size device for burning of readily available small chunks (up to 1.5 inch) of waste wood, shavings, sawdust and bark. Desired fuel moisture for optimal operation should be in the range of 30-50%. Combustion process is controlled automatically with a programmable controller. Settings depend on fuel granulation, moisture and heat demand. Goliath Line Boilers come with process controller with sensors, burner with automatic feeder and hopper.
Fuel Source
- Saw dust
- Wood chips
- Ground corn cobs
- Chicken litter
- Grains
|

Goliath 110 (370K Btu) |

Goliath 700 (2.4M Btu)
|

|

Goliath 1000 burner (3.5M Btu)
|

Complete boiler room |
Click on Thumbnails Below for Enlarged Photo:
Technical Data for Goliath Line Boilers
| Parameters |
Unit |
Goliath Boiler |
| 55 |
110 |
180 |
300 |
600 |
1000 |
1200 |
2000 |
|
| Rated Power output |
Btu |
180K |
370K |
610K |
1M |
2M |
3.5M |
4M |
6.8M |
| Heated surface |
ft2 |
59 |
124 |
190 |
270 |
43 |
78 |
95 |
144 |
| Max static pressure |
PSI |
36 |
| Max outlet water |
ºF |
203 |
| Chimney draft |
Pa |
45 |
50 |
40 |
60 |
65 |
65 |
65 |
75 |
Average exhaust gas
temperature
at flue |
ºF |
392 |
392 |
392 |
428 |
428 |
428 |
464 |
464 |
| Basic fuel consumption |
lbs/h |
22 |
42 |
73 |
120 |
240 |
400 |
480 |
800 |
| Efficiency, basic fuel |
% |
76 |
| Efficiency, with pre-furnace |
% |
82 |
| Total weight |
lbs |
1323 |
2535 |
3749 |
4740 |
6830 |
12,235 |
12,830 |
20,723 |
| Suggested chimney height |
ft |
26 |
39 |
46 |
49 |
59 |
72 |
75 |
95 |
| Chimney size |
inch |
8 |
12 |
12 |
24 |
23 |
31 |
31 |
43 |
|
A silo is assigned to collecting and storing of wood chips, sawdust in wood working facility for the latter use in Goliath boilers.
Silo is a free-standing structure, assembled on concrete plate of. 21 .5 'diameter.
The silo construction is of screwed galvanized steel sheets. It consists of a base, housing made of a zinc coated sheets of 2,5 mm thick, a bottom with rotary valve, roof, and construction for charging cyclone.
The silo is equipped in a fire extinguisher and explosion proof installation as well in blowout door.
Silo charging hopper is build in a funnel shape, where agitator operates preventing saw dust bridging.
On the bottom of charging hopper are installed: pipes slop chute and rotary valve with auger delivering saw dust to boiler hopper.
The aim of the conveyor is to move and pass sawdust to the charging boiler hopper.
ZOD 120 capacity 120m3
ZOD 180 capacity 180m3
ZOD 250 capacity 250m3
  
|
|