HOME  |   CONTACT   |  ABOUT   |   FAQ  |  NewHorizonStore.com




 



Home »NextGen BioMass Gassification Boilers

frontopen

BioMass 40 Pictures

 

 

BioMass
Product
Line

BioMass 100
BioMass 100 Pictures
 

schematic2

Technical Info

Models

BioMass

25

40

60

80

Rated Power Output

BTU

 

140

205

275

European Standard EN 303-5

 

Yes

Yes

Yes

Yes

Fuel Moisture Level

 

Cord of Wood – with a maximum of 35% moisture

Power Range

BTU

40-85K BTU

50K – 145K BTU

60K – 215K BTU

120K – 300K BTU

Efficiency

%

91.2

91

91

91

Possible Fuels

Seasoned Wood, Briquettes, Corn Cobs with Kernels, 50% of Coal, Saw Dust, Wood Chips (50%), any kind of pellets

Temperature Adjustment Range

°F

130-195 F

130-195 F

130-195 F

130-195 F

Total Weight

Lb

1190

1480

1780

2100

Height with Controller Housing

A in

59

59

59

63

Height of Hot Water Outlet

B in

56

56

59

62.5

Height of Return Water Pipe

C in

32

32.6

32.4

36.5

Height of Water Drain Valve

D in

2.7

2.7

2.7

2.75

Height of Flue Pipe

E in

46.5

46.5

46.5

49.5

Width with Clean-up Lever

F in

25

31.5

31.5

31.5

Depth

H in

39

39

54.5

59.0

Distance of Hot Water Outlet

I in

9.5

9.5

9.5

14.0

Flue Pipe Size

J in

6”

6”

6”

8”

Hot Water Outlet Pipe Size

G in

2”

2”

2”

2”

Water Return Pipe Size

G in

2”

2”

2”

2”

Drain Pipe Size

G

¾”

3/4´´

3/4´´

3/4”

Boiler Water Capacity

gal

33

40

50

68

Flue Temperature

 

 

 

 

 

-Max power output

°F

320

330

330

350

-Min power output

°F

195

210

210

210

Size of Loading Chamber

 

 

 

 

 

-depth

in

19”

20.5

30.3

30.75

-height

in

28”

24.8

24.8

34.0

-width

in

18.5”

24.8

24.8

24.75

Volume of Loading Chamber

gal

 

40

60

75

Noise Level

dB

30

31

31

31

Power Consumption

W

80W (1.4A)

80 (1.4 A)

140 (2.2 A)

140 (2.2A)

Voltage/Frequency

V/Hz

120V/60Hz

120V/60

120V/60

120V/60

 

schematics

1.Controler RK 2001 U

2.Upper Door

3.Loading Chamber (gassification)

4.Combustion Air Flow (primary)

5.Primary Air Adjustment

6.Blower Housing

7.Air Mixing Box

8.Blower (for BioMax 60)

9.Blower Air Adjustment

10.Secondary Air Adjustment

11.Refractory Nozzle

12.Door Handle

13.Secondary Burning Chamber (ash pit)

14.Lower Door

15.Flue Connection 6”

16.Clean-up Access Cover

17.Clean-up Access

18.Chimney Bipass Flap

19.Heat Exchanger Clean-up Lever

20.Overheat Thermostat

21.Hot Water Outlet

22.Lower Clean-up Access Cover

23.Lower Clean-up Access Cover

24 Boiler Water Return

25.Tubular Heat Exchanger

26.Secondary Air Injection

27.Flue Flow Direction

28.Drain Valve

29.Draft Blower


  Home »NextGen BioMass Gasification Boilers
 


 

Design & Creation by TiM